Gateway 14

Gateway 14: The scheme consisted of 2 x  33kV circuits from UKPN Primary Substation, through a dual carriageway, under the river Gipping and under National Rail Main Line to a new 33kV Primary Substation designed, installed and commissioned by High Voltage Engineering Services.

Share the Post:

Related Posts

Gateway 14

Gateway 14: The scheme consisted of 2 x  33kV circuits from UKPN Primary Substation, through a dual carriageway, under the

Read More

BESS Sites

We have been instrumental in bringing the following sites to energisation and subsequent operational status in the UK